A 500MW data centre in Berlin was connected to the grid at 380 kV.

The project involved design, procurement, permitting, construction, commissioning, and coordination with authorities.

The new 380 kV substation features 14 bay GIS switchgear connected to six power transformers, stepping down to 20 kV distribution through modular substations.