Microsoft. London

Internal fitout and facade of a Microsoft Data centre in Acton in West London. Scopes included external cladding, whitewall, drywall partitions, ventilation mesh, structural ceilings, steel doors, HACS and fire encasements.

Microsoft. Helsinki, Finland

The scope of works includes firestopping, primary & secondary steel, security and roller doors, as well as security mesh walls and screens. It also encompasses drywall partitions, wall and floor tiling, lightweight and structural ceilings, glazed screens, acoustic packages, and whitewall panel walls. Also including the full construction & fitout of the Administration building.

380/20 kV Substation – Germany

A 500MW data centre in Berlin was connected to the grid at 380 kV. The project involved design, procurement, permitting, construction, commissioning, and coordination with authorities. The new 380 kV substation features 14 bay GIS switchgear connected to six power transformers, stepping down to 20 kV distribution through modular substations.